Shipbuilding Precision: Sedong reducing manual work by 50%
Case Study | SPC 500-1200 PT
What is your greatest worry in a fabrication process? Is it complexity of the design, poor production flow management, too much material waste, loss of control over the operating expenses or lack of highly skilled welders? How to deal with the increasingly tough demands and regulations on welded structural design?